Proposed Wind Turbine, Darrington, Yorkshire

Introduction:

A potential high risk of subsidence was identified beneath the proposed location in a geological environment which was likely to become more active in a few years’ time due to changes in the hydrogeological setting. Recommendations for risk mitigation measures were provided. The project demonstrated the cost value to the Client of a desk study appropriate to the site setting and the potential dangers of the basic ‘one size fits all’ desk study commonly undertaken.

Details:

A landowner was proposing to construct a single wind turbine on part of his property. A previous investigation had suggested straightforward ground conditions. However, ESP identified features indicating an active gypsum karst environment, which posed potential risks to development not previously identified.

Do you need more information or maybe you have questions? Contact us today and let us see how we can help you.

Request a Callback

Need to speak to someone? Let us consult with you to see how we can help you.

Request a Quote

Let us evaluate your requirements, tailoring a cost-efficient solution for you.