Proposed Care Home Development, Neath

Introduction:

ESP initially completed a desk study for the development as one of a number of sites being considered for care home developments. Subsequently, a full investigation was undertaken along with the stabilisation of abandoned mine workings beneath the building footprint.

Details:

The desk study and investigation identified open workings (up to 3.0m in height) within the Swansea Four Foot coal beneath the site. The workings were stabilised by the injection of pfa:cement grout under the careful design and control of ESP.

The risk of subsidence beneath the structure was successfully mitigated. Due to careful control of the treatment works by ESP they were completed for substantially less than the initially anticipated costs.

Do you need more information or maybe you have questions? Contact us today and let us see how we can help you.

Request a Callback

Need to speak to someone? Let us consult with you to see how we can help you.

Request a Quote

Let us evaluate your requirements, tailoring a cost-efficient solution for you.